News

Brookland Construction Progresses

Process—————30 April 2012

Construction is two-thirds complete on the new home the studio is designing in Brookland. Framing and window installation are complete while the black concrete board rain screen exterior is now being applied. The views from the attic-level work studio are imposing and expansive of the neighborhood. The massing of the house is a clean and complementary take on the typical home found in this upper northeast Washington, DC neighborhood.

More News

Ferebee-Hope Campus Redevelopment

22 July 2021

The KIPP Legacy College Preparatory is founded with the guiding principles of Learn, Live, and Lead. The new high school is a part of large redevelopment site in Washington

Keep Reading

Summer 2021 Newsletter

21 July 2021

Click on the link to download:

Keep Reading

Aya featured in international Global Design forum

7 June 2021

Please visit our YouTube page for video content of Mr. Marzolf's presentation Jake Marzolf, AIA, Associate Principal, presented the Aya project at the 12th Annual Yuanye Cup International

Keep Reading

Fostering the DC Comprehensive Plan; Ferebee-Hope Redevelopment: Spring Studio27 Newsletter

21 May 2021

To download and view this PDF, click here: https://www.studio27arch.com/wp-content/uploads/2021/05/K-12-newsletter.pdf Spring

Keep Reading

Two Rivers Public Charter School at Young

18 May 2021

Studio Twenty Seven Architecture designed this 30,000 SF addition for grades 6 through 8 Young Middle School campus on 26th Street NE. Due to the limited site, the design enables future ready

Keep Reading