News

Repurpose > Replace

Process—————29 September 2014

Gallaudet University has commissioned Studio Twenty Seven Architecture to convert the mid-century modern student dormitory Peet Hall into offices for the Gallaudet Interpreting Services (GIS). While Gallaudet pushes forward with a long-term expansion plan, the University also seeks to renew and repurpose its existing buildings where possible. This approach is driven by a desire for sustainability and economy, but it also allows the school to keep buildings that have contributed to the character of the campus. Campus Architect Hansel Bauman sees the value in repurposing Peet Hall, instead of replacing it. “The bones are good – and it is a wonderful example of mid-century modernism.” As with most collegiate residential halls of this era, the structure is stable, the exterior envelope needs new windows and flashing here and there, and the mechanical system is antiquated and needs replacing – but the fundamental qualities of the building remain intact. The design reprograms the original dwelling units to create a new live/work building, updating each space according to DeafSpace principles.

Gallaudet University

More News

Studio 27 celebrates source water protection at nearly completed Beaverdam Reservoir Park

12 April 2024

This innovative park is designed to celebrate source water protection. The buildings and landscape work together to highlight the flow of rainwater into the reservoir. The Goose Creek

Keep Reading

Green Roofs: Growing Possibilities of Sustainability

13 March 2024

Our world is facing unprecedented challenges, the most of which are climate change. The construction and maintenance of buildings are responsible for over 40% of emissions currently. How we build

Keep Reading

Howard University School of Architecture Visit to Studio 27

22 November 2023

Written By: Keisha Wilson, USGBC LEED AP BD+C Howard University School of Architecture program is a fully accredited architecture program for both a Bachelor of Science in Architecture and

Keep Reading

Construction is Underway on Reservoir Park at Beaverdam Reservoir

21 July 2023

Studio Twenty Seven Architecture is working with nationally recognized landscape architect Nelson Byrd Woltz to create a new park in Loudoun County, Virginia. The park is funded and constructed

Keep Reading

GeerHouse Construction Progress Phase 1

8 March 2023

This month marks the "topping out" of concrete work at Geerhouse. "Topping out" is a milestone in the construction process marking the completion of work at the highest level above grade. The

Keep Reading